Last Updated: November 12, 2026
A portable granny flat in Australia starts at a published $27,750 inc GST for a 20 m² POMO studio, $36,120 for a 40 m² granny flat and from $62,150 for a 60 m² home, at lockup stage. Those prices include structural engineering certificates, a NatHERS energy assessment and delivery within Victoria. On top of the building you pay for your site: footings or stumps, crane access, service connections, fit-out and permit fees, each quoted for your block. A granny flat that someone lives in needs a building permit in every state, and in some places a planning permit or DA as well.
This guide covers the full cost, the approvals in each state and the installation steps. If you are weighing a factory-built unit against a site-built one, read portable vs traditional granny flat cost. If you are still choosing between a non-habitable pod and a habitable granny flat, read backyard pod vs granny flat kit.
Portable granny flat cost at a glance
| Size | Typical use | Published price (lockup, inc GST) |
|---|---|---|
| 20 m² | Studio, home office, single occupant | $27,750 |
| 40 m² | 1 to 2 bedroom granny flat | $36,120 |
| 60 m² | 2 to 3 bedroom relocatable home | from $62,150 |
Prices are POMO’s published list; see the demountable granny flat range for the designs. A standard POMO build takes about 21 days from order confirmation.
What else does a portable granny flat cost?
The building price is fixed per size. The rest of the project depends on your block, so each line is quoted after a site look or a soil test. Budget for these before you order:
| Cost line | Who quotes it | What moves the price |
|---|---|---|
| Site survey and soil test | Surveyor and geotechnical engineer | Lot size, slope, whether the soil class is already known |
| Stumps, piers or slab | Footing or concrete contractor | Soil class, slope, height off the ground |
| Crane and access | Crane hire, with the transport quote | Distance from the street, overhead power lines, trees, fences to remove |
| Power, water and sewer connections | Licensed electrician and plumber | Distance to the main house services, need for a sewer pump or septic system |
| Internal fit-out | POMO or your own trades | Kitchen, bathroom, flooring and fixtures chosen |
| Permit and planning fees | Building surveyor and council | Whether a planning permit or DA is needed as well as the building permit |
| Delivery outside Victoria | Quoted with your order | Distance and route |
Ask for every line in writing before you commit. A fair comparison between suppliers is the building price plus these site lines for the same block.
Do you need a permit for a portable granny flat?
Yes. Being transportable does not change the approval. Once someone lives in it, a granny flat is a Class 1a building under the National Construction Code and needs a building permit from a building surveyor. Whether it also needs a planning permit or development application depends on your state, zone and overlays.
| State | Granny flat size and planning pathway | Source |
|---|---|---|
| Victoria | From 15 October 2026 (amendment VC306) a small second dwelling can be up to 80 m², often with no planning permit on a lot of 300 m² or more; building permit always required | Planning Victoria |
| New South Wales | Secondary dwelling under the Housing SEPP, generally up to 60 m² or the area in the council’s LEP; complying development needs a lot of at least 450 m² | NSW Planning |
| Queensland | Size set by the council’s planning scheme. The Queensland Housing Code, which councils can adopt during a three-year transition from 1 September 2026, defaults to 50 m² (60 m² on lots of 1,000 m² or more) | Queensland Government |
| Western Australia | Up to 70 m² meeting the R-Codes deemed-to-comply provisions needs no development approval on a residential lot of any size; a building permit is still needed. A draft change to 90 m² is out for comment until 26 February 2027 and is not law yet | WA Government |
| South Australia | Up to 70 m² and no more than 2 bedrooms follows the Planning and Design Code deemed-to-satisfy pathway; every granny flat needs development approval | PlanSA |
| Other states and territories | Check your council’s planning scheme and a building surveyor before you order | Your council |
For Victoria in more detail, read our granny flat rules in Victoria. Which edition of the NCC applies also differs by state; the ABCB keeps the NCC 2025 adoption table.
How is a portable granny flat installed?
The building is made in the factory while your approvals and site works run, so most of the work on your block happens in the last few days.
- Check the site. Confirm zoning, setbacks, overlays and bushfire attack level (BAL) with your council or building surveyor, and check that a truck and crane can reach the spot.
- Get the permits. Lodge the building permit (and planning permit or DA where needed) with the engineering certificates and NatHERS assessment that come with the building.
- Prepare the footings and services. Stumps, piers or a slab go in, and power, water and sewer are brought to the position.
- Deliver and place. The building arrives on a truck and is craned onto the footings, then levelled and tied down. Modules up to 3.5 m wide travel without oversize permits.
- Connect and inspect. Licensed trades connect the services, the building surveyor carries out the final inspection, and the occupancy permit is issued.
What should you check before you buy?
- Access: narrow driveways, overhead power lines and trees can stop a crane lift or add cost.
- Bushfire: in a bushfire-prone area the building must be specified for your BAL under AS 3959; read BAL ratings for portable buildings.
- Frame material: steel frames do not rot and are not eaten by termites; see steel frame vs timber portable buildings.
- Warranty: BlueScope’s TRUECORE steel warranty covers the steel only. Ask the supplier in writing what other warranties apply to the building.
- Moving it later: a portable granny flat sits on stumps or a slab with removable connections, so it can be lifted off and relocated. A new site needs its own permits.
Prefer to manage the build yourself? A structure-only steel frame kit is another route; Kit Home Floor Plans lists granny flat designs with published kit prices.
Portable granny flat FAQs
How much does a portable granny flat cost in Australia?
POMO’s published prices are $27,750 for 20 m², $36,120 for 40 m² and from $62,150 for 60 m², at lockup stage and inc GST. Site works, connections, fit-out and permit fees are quoted for your block.
Do I need a building permit for a portable granny flat?
Yes. A granny flat that is lived in is a Class 1a building under the National Construction Code and needs a building permit, whether it is built in a factory or on site. Some sites also need a planning permit or DA.
How long does a portable granny flat take?
A standard POMO build takes about 21 days from order confirmation. Approvals and site works set the rest of the timeline and can run while the building is made.
What is not included in the published price?
Site survey and soil test, stumps or slab, crane and access work, service connections, internal fit-out, permit fees and delivery outside Victoria are quoted separately.
Can I move a portable granny flat to a new property?
Yes. It can be lifted off its stumps or slab and relocated. The new site needs its own building permit and, where required, planning approval.
Next step: call 1300 866 131 or send us your address and the size you want, and we will quote the building and the site lines for your block.