Last Updated: November 4, 2026

Modular or traditional, the better investment is the one with the lower total cost to a rentable or liveable home on your site, including the months you carry a loan or pay rent while it is built. A modular home is built in a factory while your site is prepared, so the two jobs run in parallel; a traditional home is built on site one stage after another. Both must meet the National Construction Code, and both need a building permit. POMO’s TRUECORE steel modular buildings are published from $27,750 inc GST (20 m²) to from $62,150 inc GST (60 m²) at lockup stage, which gives you a firm starting figure to compare against a traditional quote.

Modular vs traditional homes: the key differences

Modular (factory built) Traditional (built on site)
Where it is built In a factory, then transported and placed on footings On your block, stage by stage
Site works Done at the same time as the building is made Done before the frame goes up
Weather exposure Building made under cover Frame and materials exposed until lock-up
Price basis Fixed price for the stated stage (for POMO, lockup) plus site costs Contract price plus any variations
Building code NCC, same as any new building NCC
Approvals Building permit, plus planning permit or DA where the zone needs it Same
Site limits Needs truck and crane access for delivery Needs access for materials and trades

Want the difference between factory modules and a flat-pack kit? See the difference between modular homes and kit homes.

What a modular home costs in 2026

These are POMO’s published prices, all at lockup stage and inc GST. They include structural engineering certificates, a NatHERS energy assessment and delivery within Victoria. Fit-out is additional.

Size Typical use Published price (lockup, inc GST)
20 m² Studio, home office, small rental studio $27,750
40 m² Granny flat, one bedroom dwelling $36,120
60 m² Two bedroom granny flat or small home From $62,150

We don’t publish a per-square-metre rate for traditional builds or a “typical total” for either method, because both depend on your block, your finishes and who does the work. Compare like with like by pricing each line below for your site.

How to compare the two for your site

Cost line Modular Traditional Who prices it
Building Published price at the stated stage Builder’s contract price Supplier or builder
Fit-out to finish Extra if the price is at lockup Usually in the contract Your trades or the builder
Footings or slab Stumps, screw piles or slab Slab or footings Concreter or builder
Delivery and crane Transport plus crane hire for your access Not applicable Supplier and crane company
Service connections Water, sewer, power, stormwater Same Licensed plumber and electrician
Permits Building permit, and planning permit or DA if needed Same Council and building surveyor
Holding cost Your monthly rent or interest x months to occupancy Same formula, with the builder’s timeline You

The holding cost line is where the methods differ most. Use each supplier’s written timeline for your job, multiply it by what you pay each month in rent or loan interest, and add it to the total. For a rental, add the rent you would collect from the occupancy date instead.

Granny flat and second dwelling rules

Most investors put a modular building on an existing lot as a second dwelling. In Victoria a small second dwelling of up to 80 m² (from 15 October 2026, under amendment VC306) usually needs no planning permit if it meets the standards, but always needs a building permit (Planning Victoria). In NSW a secondary dwelling can be up to 60 m² under the Housing SEPP. Victoria builds to NCC 2025 from 1 May 2026; NSW stays on NCC 2022 until 1 May 2027 (ABCB adoption table). For rural blocks, see rural land without complex permit requirements, and for NSW, modular homes in NSW.

When modular makes financial sense

  • When time to income matters. Site works and the building happen at the same time, so the holding period can be shorter.
  • When you want a fixed building price. A published price at a stated stage is easier to budget than a contract with provisional sums.
  • When you are owner building. You manage the site works and services while the factory makes the building; see our 2026 owner-builder guide.
  • When the site has good access. Truck and crane access keeps delivery costs down.

When traditional or flat pack may suit better

  • Difficult access. Narrow bridges, tight corners or overhead power lines can make module delivery impractical. A kit delivered as parts, such as flat pack modular systems, is the middle ground. For a steel frame kit home with plans to choose from, see Kit Home Floor Plans.
  • Heritage overlays. Some councils set design controls that a standard module has to be adapted to meet.
  • Large, complex homes. Big multi-level designs are usually built on site or as a kit rather than as transportable modules.

Common mistakes when comparing modular and traditional

  • Comparing different stages. A lockup price is not a finished price. Check the stage on every quote.
  • Leaving out site costs. Footings, connections, crane hire and permits apply to both methods.
  • Ignoring holding costs. Months of rent or interest belong in the total.
  • Skipping the lender and insurer. Ask your lender and insurer early how they treat a factory-built home on your title, because policies differ.

Frequently asked questions

Is a modular home a good investment in Australia?

It can be when it reaches occupancy sooner and at a lower total cost than a traditional build on the same site. Compare the full cost, including footings, connections, permits and holding costs, using written quotes and timelines from each supplier.

How much does a modular home cost?

POMO’s published lockup prices are $27,750 inc GST for 20 square metres, $36,120 inc GST for 40 square metres and from $62,150 inc GST for 60 square metres, including engineering certificates, a NatHERS assessment and delivery within Victoria. Fit-out, footings, connections and permit fees are extra.

Do modular homes have to meet the same building code as traditional homes?

Yes. A modular home must meet the National Construction Code edition that applies in your state, and it needs a building permit like any other new building.

Can I get a home loan for a modular home?

Lenders treat factory-built homes differently, especially for progress payments before the building is on your land. Ask your lender how it handles a modular home before you sign a building contract.

Next steps

Tell us your address, the size you need and whether it is for you or a tenant, and we’ll confirm the published price, delivery and what your site needs.