Last Updated: November 3, 2026

A demountable granny flat is a self-contained secondary dwelling built in a factory, delivered to your block on skids and placed on stumps or a slab, so it can later be lifted off and relocated. A POMO TRUECORE steel granny flat starts at $36,120 inc GST for 40 m² at lockup stage, and you still need a building permit (and in some cases a planning permit or DA) before it can be lived in.

What is a demountable granny flat?

It is a second home on your lot that is built off site and fixed to the ground with removable connections instead of being built in place. Once it is used as a permanent dwelling it is a Class 1a building under the National Construction Code, so it must meet the same structural, fire, energy and health rules as any house. The difference is how it is built and moved, not the standard it is built to.

POMO buildings use a BlueScope TRUECORE steel frame on skids. They are transported by tilt tray or crane truck (up to 3.5 m wide without oversize permits) and placed on your prepared stumps or slab, ready for fit-out.

Factory-built vs site-built

Building the frame and shell under one roof keeps materials out of the weather and lets site work (footings, service trenches, approvals) run at the same time as the build. POMO’s published lead time is approximately 21 days for a standard build from order confirmation; your approval pathway and site works set the rest of the timeline.

How much does a demountable granny flat cost?

These are POMO’s published prices, all at lockup stage and inc GST. They include structural engineering certificates, a NatHERS energy assessment and delivery within Victoria. Fit-out is additional.

Size Typical use Published price (lockup, inc GST)
20 m² Studio, home office, small granny flat $27,750
40 m² 1 to 2 bedroom granny flat $36,120
60 m² 2 to 3 bedroom relocatable home from $62,150

What else you pay for, and who prices it

We do not publish an “all-in” figure because the rest depends on your block. Get each line quoted for your site:

Cost line Who quotes it
Site survey, soil test and footing design Surveyor and engineer
Stumps or slab Concreter or stumping contractor
Crane or access work (narrow streets, power lines) Crane or transport operator
Power, water and sewer connections Licensed electrician and plumber
Internal fit-out (linings, kitchen, bathroom) Your builder or trades
Planning and building permit fees, any council contributions Council and building surveyor or certifier
Delivery outside Victoria Quoted with your building

For a full worked example, see our portable granny flat cost and permit guide.

Do you need a permit for a demountable granny flat?

Yes. A demountable granny flat used as a home needs a building permit (in NSW, a complying development certificate or a DA plus a construction certificate), the same as a site-built granny flat. Whether it also needs a planning permit depends on your state, zone and overlays.

State Main rule for a granny flat
Victoria A small second dwelling of up to 80 m² from 15 October 2026 (amendment VC306), often without a planning permit on a residential lot of 300 m² or more; a building permit is always required. See the small second dwelling guide and our Victorian granny flat rules.
New South Wales A secondary dwelling under the Housing SEPP, generally up to 60 m² (or a larger area set by your council’s LEP); complying development needs a lot of at least 450 m² (NSW Planning).
Tasmania and South Australia Approved through a building surveyor or certifier and your council’s planning scheme. Check the zone and any bushfire overlay before you order.

What decides your approval pathway?

  • Zoning: residential zones are simpler than rural, green wedge or environmental zones.
  • Lot size, width and site coverage after the granny flat goes in.
  • Overlays: bushfire (BAL rating under AS 3959), flood and heritage.
  • Setbacks from boundaries and from the main house.

Talk to a building surveyor or certifier before you order. They confirm the pathway and list the documents needed: site plan, floor plans, elevations, engineering for the building and footings, and the energy assessment.

Engineering certification

Every POMO building ships with structural certificates signed by registered engineers. The footing design is site specific and is normally prepared by a local engineer from a soil report.

Demountable granny flat vs tiny home on wheels

Demountable granny flat Tiny home on wheels
What it is legally A Class 1a building on stumps or a slab A registered trailer or caravan
Approvals Building permit; planning permit or DA depending on zone Council caravan or local law rules, often with time limits
Services Permanently connected to power, water and sewer Often temporary or off-grid connections
Can it move? Yes, by crane or tilt tray, with new footings and approvals at the new site Yes, by towing

How to compare demountable granny flat quotes

  • Ask for the engineering certificates and NatHERS assessment that come with the building.
  • Check the quote states the stage it is priced at (lockup or fully fitted out) and lists what is included.
  • Check that site works, delivery, crane and connections are priced separately so you can compare like with like.
  • Ask what warranty covers the steel frame; for TRUECORE frames the BlueScope warranty covers the steel only.

Demountable granny flat FAQs

How much does a demountable granny flat cost?

POMO’s 40 m² granny flat is $36,120 inc GST at lockup stage, including engineering certificates, a NatHERS assessment and delivery within Victoria. Footings, connections, fit-out and permit fees are extra and depend on your site.

Can I rent out a demountable granny flat?

In most states, yes. In NSW a secondary dwelling can be rented to anyone. In Victoria a small second dwelling can be rented, but check your council for any conditions that apply to your lot.

Does a demountable granny flat need a building permit?

Yes, if anyone will live in it. It is a Class 1a dwelling and needs a building permit (or a CDC or construction certificate in NSW), whether it is built on site or delivered on skids.

Can a demountable granny flat be moved later?

Yes. It can be lifted off its stumps and relocated, but the new site needs its own footings, service connections and approvals.