Last Updated: November 2, 2026

Whether a portable building used as a dwelling requires a building permit depends on the applicable local requirements. Here’s what you need.

Required Documentation

  1. Structural engineering certificate (registered engineer) – POMO includes this
  2. Energy efficiency assessment (minimum rating depends on applicable requirements) – POMO includes this
  3. Architectural/construction drawings
  4. Site plan (showing boundaries, setbacks, services)
  5. Additional reports if applicable (BAL, geotechnical, flood, heritage)

Process

Choose building surveyor (private is faster than council) → Prepare application → Submit with fees (amount depends on the surveyor and council) → Assessment (timeframe depends on the application) → Permit issued.

POMO Advantage

Complete documentation package included: engineering, energy assessment, drawings, specifications, foundation requirements, roofing certificate.

After Permit

Mandatory inspections (foundation, final), Certificate of Occupancy required before legal occupancy.

Contact POMO for buildings with complete permit documentation.